Industry Industry

Welcome to our HIC Machinery Co. !

We'are Open: Tue- Sun 8:00 - 18:00
+91 95016 45555
Near Verka Milk Plant, Verka, Amritsar.

Over Head Bridge

ONLINE SUPPORT

Get immediate quotes & technical assistance.

    Over Head Bridge

    The Over Head Bridge is designed for smooth transfer of single face board from the single facer to the Triplex pre-heater. Built with durable structural components, it ensures stable board movement, proper paper alignment, and efficient production flow in corrugation plants.

     

    Heavy-duty structure using channels, angles, and wooden chequer plyboard
    Two sets of take-up conveyors on each single facer
    Two-layer level-type conveyor system
    Smooth transfer of single face board to Triplex pre-heater
    Manual left and right paper width adjustment
    Supplied with walkways and two staircases

    Quality Industrial Working

    The Over Head Bridge provides stable board handling, smooth material flow, and reliable support for high-speed corrugation operations, ensuring efficient production and consistent board movement.